Domed-Stud Collar with 116 cm Long Lead — Kink

4,49€
8,99€
−50%
You save 4,50€

A 5 cm black collar decorated with 8 smooth domed rivets with its 116 cm long lead.

  • Eight domed silver metal rivets
  • 5 cm wide matte black faux leather band
  • Matching 116 cm long flat lead
  • Solid metal rear adjustment buckle
In stock· get it
Dispatched today · free delivery from €39
Buy in 1 click
100% secure payment
Discreet delivery
14-day returns
EXPERT REVIEW
Jerome Guesne
Sex Toy Expert
140+ produits testés
This model is ideal if you want a chic but studded collar without sharp points. The 116 cm long lead is very pleasant to handle for ground play and allows you to create striking control scenes.

Gaining distance while maintaining a firm control is what this 5 cm black collar adorned with smooth domed rivets allows. It comes with a matching 116 cm long flat lead.

Shiny silver domed rivets

Eight round, smooth metal rivets decorate the front of the collar. They capture the light while ensuring a soft touch, thus avoiding scratching your partner's skin during caresses.

Long 116 cm faux leather lead

The 116 cm flat lead allows you to lead your submissive with plenty of range. You wrap it around your fist to reduce the range of movement or leave it loose to give your submissive more freedom of movement.

Comfortable 5 cm faux-leather band

The matte black faux leather strap provides firm support without restricting breathing. The classic metal buckle closure easily adjusts in several notches.

PVC
Material
110 g
Weight
Beginner
Intensity
Our expert's summary
Recommended for
BDSM sessionsConsensual submissionCurious beginnersFetish look