Black Model 1 Collar with 116 cm Leash — Kink
Black Model 1 Collar with 116 cm Leash — Kink is backordered and will ship as soon as it is back in stock.
The lowest price guaranteed
Found this product cheaper from a competitor at the time of purchase or within 14 days? We'll refund the difference.
- 1Send us the link to the cheaper product.
- 2We'll check availability and eligibility.
- 3We'll refund the difference within 48h.
Conditions
- The product must be NEW and strictly identical (brand, model, size and colour).
- The retailer must be based in France or the EU and operate a professional online shop, excluding marketplaces and resale platforms.
- The product must be in stock and dispatched by the competitor within 7 days.
- The competitor's price must include delivery (VAT-inclusive price compared with VAT-inclusive price).
- The guarantee cannot be combined with a promo code, referral offer or discount already applied.
- Excludes official sale periods, private sales, exceptional clearance events and Black Friday/Cyber Monday.
- Excludes group purchases, B2B orders and professional bundles.
- Limited to one claim per order, within 14 days of delivery.
- Refunds are issued to the original payment method within 48h of approval.
Model D-240769 is a black collar without rivets, adjustable from 36 to 43 cm and 5 cm wide. Its removable flat leash measures 116 cm; no maximum load is published.
This black Kink model 1 collar is 5 cm wide and adjusts from 36 to 43 cm. It comes with a 116 cm flat leash that detaches with its carabiner.
Black collar without rivets
The photos show a black surface structured by two stitched horizontal bands. There are no domed rivets. A pin buckle adjusts the neck circumference.
116 cm flat leash
Clip its carabiner to the collar’s D-ring to guide your partner gently. Do not pull sharply on the neck and never use it for suspension.
Adjusts from 36 to 43 cm
Measure the neck before use and leave enough room to breathe and speak normally. Check the buckle, stitching, ring and carabiner before every session.
| Type | Collar |
| BDSM category | Bondage, Soumission |
| Adjustable | Yes |
What size neck does this collar fit?
Is the lead durable?
Can we change the lead?
Free standard delivery from 40,00 € . Destination: France.
Estimated transit: 2–3 working days after dispatch.
Based on the basket total after discounts. Conditions and options are confirmed with your address at checkout.
— RETURNS
14 days from receipt for sealed, unused products. For hygiene reasons, an unsealed sex toy cannot be returned.




