Black Faux-Leather Collar with Faux-Fur Lining & Long Lead

7,99€
12,99€
Sale−38%
You save 5,00€

A wide collar in black faux leather lined with fluffy synthetic fur with a 116 cm lead.

  • Cushioned black faux-fur lining
  • Matching 116 cm long faux leather lead
  • 6 cm wide strap offering firm support
  • Neck circumference adjustable from 40 to 48 cm
In stock· get it
Dispatched today · free delivery from €39
Buy in 1 click
100% secure payment
Discreet delivery
14-day returns
EXPERT REVIEW
Jerome Guesne
Sex Toy Expert
140+ produits testés
The fur-lined collar is a must for comfort. The 116 cm lead offers great extension for walking on the ground, and the thickness of the strap gives a real visual presence which prepares you for sodomy.

Offer your submissive the absolute comfort of a soft caress with this collar lined with black faux fur from Kink. Made for prolonged bondage sessions in bed, it combines the exterior firmness of black faux leather and the extreme softness of its lining. It comes with its 116 cm long lead.

Ultra-plush faux fur lining

The thick synthetic fur pad lines the entire interior of the 6 cm wide strap. It eliminates friction and protects your submissive's throat from irritation, even if he keeps the collar on all night. The adjustment is made precisely from 40 to 48 cm using a classic buckle.

Tactile letting go and anal relaxation

The contrast between the firmness of the strap and the comfort of the fur encourages your submissive to fully surrender. Relieved of any painful neck constraints, he focuses on his intimate sensations. This mental calming helps relax the entrance and buttocks for fluid and ultra-sensual sodomy.

Vegan leather
Material
43 cm
Dimensions
123 g
Weight
Beginner
Intensity
Our expert's summary
Recommended for
BDSM sessionsConsensual submissionCouple playCurious beginners