Black Studded Collar with Fuzzy Lining & 116 cm Leash — Kink
Black Studded Collar with Fuzzy Lining & 116 cm Leash — Kink is backordered and will ship as soon as it is back in stock.
The lowest price guaranteed
Found this product cheaper from a competitor at the time of purchase or within 14 days? We'll refund the difference.
- 1Send us the link to the cheaper product.
- 2We'll check availability and eligibility.
- 3We'll refund the difference within 48h.
Conditions
- The product must be NEW and strictly identical (brand, model, size and colour).
- The retailer must be based in France or the EU and operate a professional online shop, excluding marketplaces and resale platforms.
- The product must be in stock and dispatched by the competitor within 7 days.
- The competitor's price must include delivery (VAT-inclusive price compared with VAT-inclusive price).
- The guarantee cannot be combined with a promo code, referral offer or discount already applied.
- Excludes official sale periods, private sales, exceptional clearance events and Black Friday/Cyber Monday.
- Excludes group purchases, B2B orders and professional bundles.
- Limited to one claim per order, within 14 days of delivery.
- Refunds are issued to the original payment method within 48h of approval.
Model D-240780 adjusts from 40 to 48 cm, is 6 cm wide and includes a 116 cm leash. The silver-coloured studs and fuzzy black lining are visible, but their exact composition is not published.
This black Kink model 4 collar is decorated with silver-coloured studs and has a visible fuzzy black lining. It is 6 cm wide, adjusts from 40 to 48 cm and includes a 116 cm flat leash.
Silver-coloured studs and fuzzy lining
The studs cover the outer face, while fuzzy black material lines the inside. The manufacturer does not publish the exact composition of either the strap or the lining.
116 cm flat leash
Its carabiner attaches to the front ring. Guide your partner without jerking or strong pulling, and do not wrap the leash around the neck or a limb.
Adjusts from 40 to 48 cm
Measure the neck and check that the wearer can breathe, speak and move normally. No maximum load is published, and this collar is not designed for suspension.
| Type | Collar |
| BDSM category | Bondage |
| Adjustable | Yes |
Does fur keep you warm?
Does the lead come off?
What is the adjustment diametre?
Free standard delivery from 40,00 € . Destination: France.
Estimated transit: 2–3 working days after dispatch.
Based on the basket total after discounts. Conditions and options are confirmed with your address at checkout.
— RETURNS
14 days from receipt for sealed, unused products. For hygiene reasons, an unsealed sex toy cannot be returned.




