Black Leather Fetish Collar with 116 cm Extra-Long Lead

7,99€
13,99€
Sale−43%
You save 6,00€

A wide matte black faux leather collar with extra-long lead to direct play from a distance.

  • 5 cm wide collar structuring the head position
  • Matching 116 cm flat lead with integrated handle
  • Soft, quiet strap in matte faux leather
  • Precise adjustment via metal pin buckle
In stock· get it
Dispatched today · free delivery from €39
Buy in 1 click
100% secure payment
Discreet delivery
14-day returns
EXPERT REVIEW
Jerome Guesne
Sex Toy Expert
140+ produits testés
The extra-long 116 cm lead is great for orchestrating ground BDSM play. The 5 cm wide collar gives a real visual presence. By keeping him at a distance, you promote his complete bodily relaxation before penetration.

Take the reins of the session and lead your submissive with this fetish collar and its strap of more than one metre. This classic bondage accessory immediately sets the balance of power in the bedroom. The length of the lead allows you to guide him from a distance, which is well suited to making him crawl or holding him at the foot of the bed.

116 cm lead to guide its movements

The flat black faux leather strap of more than one metre offers plenty of reach without forcing you to stay close. Its sturdy handle provides firm support to direct your submissive's movements or control their movements from one room to another. The smooth movement of the leather replaces the clicking of a chain for a quiet, intimate atmosphere.

Total submission and optimal anal relaxation

Putting this 5 cm wide collar around your submissive's neck is the effective way to get him to let go. By giving up his freedom of movement, he frees his mind from the need for control. This psychological relaxation leads to a reflex relaxation of the pelvis and the anal area, facilitating deep and tension-free sodomy.

Vegan leather
Material
43 cm
Dimensions
118 g
Weight
Beginner
Intensity
Our expert's summary
Recommended for
BDSM sessionsConsensual submissionCouple playCurious beginners