Black Faux-Leather Collar, 50 × 5 cm, with 116 cm Leash — Kink

7,99 €
13,99 €
−43%

A black faux-leather Kink collar with its 116 cm flat leash.

  • Collar strap: 50 × 5 cm
  • Black faux leather
  • Removable 116 cm flat leash
  • Buckle, front ring and carabiner
In stock
Free standard delivery from 40€ Delivery info
Buy in 1 click
100% secure payment
Discreet delivery
14-day returns
OUR EXPERT’S REVIEW
Jerome Guesne
Toy expert
140+ products tested
Model D-240779 combines a 50 × 5 cm black faux-leather collar with a 116 cm flat leash. The manufacturer publishes neither a neck circumference range nor a maximum load.

This Kink collar is made from black faux leather. Its strap measures 50 × 5 cm and it comes with a 116 cm flat leash and handle.

50 × 5 cm faux-leather strap

A pin buckle adjusts the collar. Measure the neck before use and leave enough space to breathe and speak normally.

116 cm flat leash

The leash attaches to the front ring with a carabiner and has visible rivets near its joins. Guide your partner without jerking or strong pulling.

Use without load

No maximum load is published. Check the buckle, rivets, ring, stitching and carabiner before every session, and never use the set for suspension.

50 cm
Dimensions
Our expert's summary
Recommended for
BDSM sessionsConsensual submissionCouple playCurious beginners