Smooth Black Model 2 Collar with 116 cm Leash — Kink

6,49 €
9,99 €
−35%

A smooth black Kink model 2 collar with its 116 cm flat leash.

  • Adjustable from 36 to 43 cm
  • Collar width: 5 cm
  • Removable 116 cm flat leash
  • Understated finish without studs or rivets
In stock
Free standard delivery from 40€ Delivery info
Buy in 1 click
100% secure payment
Discreet delivery
14-day returns
OUR EXPERT’S REVIEW
Jerome Guesne
Toy expert
140+ products tested
Model D-240770 is 5 cm wide, adjusts from 36 to 43 cm and includes a removable 116 cm flat leash. No maximum load or suitability for fixed attachment is published.

This smooth black Kink model 2 collar is 5 cm wide and adjusts from 36 to 43 cm. Its matching flat leash measures 116 cm and detaches with its carabiner.

Smooth black surface

The collar has an understated finish, with no decorative studs or rivets. Its pin buckle provides several adjustment settings.

116 cm flat leash

The long leash attaches to the collar’s D-ring. Use it to guide your partner with measured movements, never for sudden pulling or to support weight.

Adjusts from 36 to 43 cm

Measure the neck before choosing a setting. Leave enough room to breathe and speak normally, and check the stitching, buckle and carabiner before every session.

Our expert's summary
Recommended for
BDSM sessionsConsensual submissionCurious beginnersRole play